The Black Mill Wheelers Lane Navestock Brentwood Essex CM14 5RN
Remove two levels of weatherboards above the drip, as well as the old drip. Form and fit new timber drip detail, affixing code 4 lead detail on top to the new drip and re-fit new weatherboards and paint black (as existing). Re-rendering of the ground floor, remove existing sand and cement render and point. Replacement of guttering.