20 Christmas Steps Bristol BS1 5BS
To install new external extraction duct work to the building, consisting of small diameter galvanised round ducting, to exit the building at ground floor level, within a rear open alleyway, that is not visible from any public access routes. Duct work will run vertically to roof line.