Proposed Development South Of Church Lane Papworth Everard Cambridgeshire
Non material amendment of planning permission S/1159/19/VC (Variation of conditions 5 (Arboricultural method statement) 11 (Remediation method statement) 14 (Demolition and construction method statement) and 30 (Remediation method statement) of planning permissionS/2859/16/VC) Amendment to the location of the local area of play, and slight change in the local area of play equipment to suit the new location.