Adelaide House London Bridge London EC4R 9HA
External and internal alterations of the building including: (i) fabric removal and refurbishment works on all floors; (ii) replacement of all windows; (iii) installation of two additional lift shafts and lifts; (iv) extension of floor slabs into service risers; (v) removal of half landing toilet floors; (vi) reconfiguration of main entrance and foyer including new sesame lift, new doorways in internal wall, platform lifts to ground floor level and installation of new sesame lift at riverside level; (vii) alterations to eastern lightwell including extension into service riser with new windows and refurbishment of external fire escape stairs/lift; (viii) replacement of plant including rooftop plant rooms, lowering of south eastern corner rooftop wall and erection of roof top lobby with associated landscaped amenity terrace; (ix); and internal alterations to level -2 to create new cycle parking, changing facilities and waste storage facilities.