12 Devonshire Square London EC2M 4TE
Internal and external works comprising of: (i) the removal of the basement toilet block and reinstatement of the courtyard; (ii) the removal of the ground floor toilet block; (iii) the installation of an external staircase connecting to the basement courtyard; (iv) removal of ground floor bay window and reinstatement of sash window; (v) repair and reinstatement of historic features; (vi) removal of modern windows and replacement with sash and casement windows; (vii) removal of modern kitchen and sanitary fittings, joinery, services and partitions and replacement with upgraded layouts and services; (vii) removal of partitions at entrance and first and second floors; (ix) installation of exterior plant at roof level; (x replacement of existing roof lantern with double glazed lantern unit; (xi) the installation of insulation to roofs; (xii) repair and replacement of damaged slates to pitched roofs and replacement of asphalt coverings on flat roofs; (xiii) installation of new metal balustrade at roof level; (xiv) installation of a flag pole on the front elevation; and (xv) the provision of cycle parking, (xvi) the installation of an entrance door in the front elevation at lower ground floor level; (xvii) the removal of the pitched roof and replacement with flat roof to the rear. *RE CONSULTATION DUE TO REVISED PLANS AND DESCRIPTION*