Carriage Hall 29 Floral Street London WC2E 9TD
Internal works including demolition of internal modern construction walls, installation of proposed internal metal studwork walls to perimeter and centre of floor plan. Walls to be painted white and ceilings, installation of proposed wall bays to perimeter and installation of new plasterboard ceilings, to be located between historical beams as to not cover them up.