Bobs Copse Kemble Wick Kemble Gloucestershire
The installation of a solar farm, with substation, small battery site, inverters and associated equipment. Panels will be laid in rows and a simple metal framework that is driven into the ground would support each of the panels, thereby avoiding the use of concrete foundations. The top edge of each panel would be approximately 3.25 meters above the ground at its highest point. The rows of modules would be spaced approximately 4.0 - 7.5 meters apart and track the orientation of the sun from East to West. The array would be set back from its boundaries by a distance of not less than 5.0 meters. Electricity will be transported to the Grid via the substation neighbouring the North West part of the land.