Ramside Hall Hotel Ramside Durham DH1 1TD
Discharge of conditions 5 (Car Parking Details), 6 (Surface Water Drainage), 7 (Foul Water Drainage), 8 (Construction Method Statement), 11 (Details of External Materials) of DM/20/02918/FPA (erection of 4no. woodland lodges).