1-3 Parliament Square Hertford Hertfordshire SG14 1EX
Refurbishment of second floor with the demolition of a lightweight stud wall and addition of an acoustic treatment to the existing wall. Removal of plaster board ceiling. New doorway to the rear of the existing barber shop, replace modern window in dividing wall between barber shop and stairwell. Refurbishment of stairwell.