Brookbank 103 Turkey Street Enfield EN1 4PH
Installation of 1no. smoke AOV's to the top of the south stairwells within the existing window apertures. Installation of 4 x bin enclosures (metroSTOR) and new concrete slab adjacent to west boundary together with extension of the existing tank room to form a larger tank room alongside a new adjoined battery room to serve the new sprinkler system. (Amended Description).