Land Off Teal Close Netherfield Nottinghamshire
Discharge of conditions 11 (Flood Resilience Measures), 16 (Surface water Drainage), 17 (Foul Drainage), 18 (Remediation Strategy), 19 (Verification Plan), 20 (Contamination), 21 (Lighting during Construction Phase), 24 (CEMP) and 36 (Local Labour Agreement) of planning permission 2017/0999 (Retail terrace)