Morley Mills Morley Street Daybrook Nottinghamshire
Existing ducting will be used for entry, though a small amount of civils is required to reach 46-60. In communal areas, Openreach propose to run invisilight cabling flush against the ceiling/wall crease with a small POE box to be fitted above each front doorway. Whenever the cabling is routed along the brickwork in communal areas, this will be protected by PVC trunking. External cabling (left naked) will run high along the walls to reach those flats with an external entrance, again with a POE box fitted above each door.