9 - 11 High Street Gosport Hampshire PO12 1BX
CHANGE OF USE FROM 1ST FLOOR TO PROVIDE 4NO. 2 BEDROOM FLATS AND 2ND FLOOR TO PROVIDE 3NO.1 BED FLATS; ERECTION OF 3RD STOREY (4TH FLOOR) TO EXISTING BUILDING AND ERECTION OF 4 STOREY SIDE EXTENSION TO PROVIDE 4NO. 1 BED FLATS; ERECTION OF STAIRCASE ON REAR ELEVATION; INSTALLATION OF WINDOWS ON FRONT, REAR AND SIDE ELEVATIONS AND ALTERATIONS TO EXISTING WINDOWS; AND, PROVISION OF REFUSE AND BICYCLE STORAGE (CONSERVATION AREA) (as amended by plans received 23.05.2019, 31.05.2019 AND 26.11.2019)