St Pauls Girls School Brook Green London W6 7BS
Erection of access ramps, steps and an extended landing to the front entrance of the main school building following the demolition of the existing steps, including the installation of handrails, guardrails, external lighting and reconfiguration of the forecourt, including hard and soft landscaping. Internal alterations including provision of a concealed platform lift within the existing steps of the front entrance lobby, installation of timber framed glazed screens and widened glazed doors within the side walls of the front entrance lobby and associated removal and modification of existing timber panelling, architraves, internal doors and handrails, alterations to reception rooms at upper ground floor level.