Old Oak Common Lane London NW10 6DZ
Application under Schedule 17 of the High Speed Rail (London-West Midlands) Act 2017 for works associated with the extension of the previously consented replacement Great Western Mainline Bridge and a new bridge to non-preclude a potential future extension of the Chiltern Line; collision protection beam; modifications to abutments of existing Intercity Express Programme Bridge; earthworks; retaining walls; guardrails; track access stairs; fencing and lighting equipment (Consultation by OPDC ref: 23/0020/HS2OPDC).