MPT Parkway Station Luton Bedfordshire LU2 0SX
Full planning permission for the construction of approximately 2.2km twin guideways mass passenger transit (MPT) system comprising track bed between Luton Airport Parkway Station and Luton Airport Central Terminal together with related structures/engineering operations including new service roads, storm retention tanks, a viaduct along the railway, a bridge over the A1081 (Airport Way) road, slab in a cut or on embankment, a trough and a tunnel; a new two storey MPT station adjacent to Luton Airport Parkway Station to include ancillary retail (A1) outlets and a new Central Terminal MPT Station; five temporary construction compounds; and Outline planning permission for an over-bridge link and extended station concourse from the existing Luton Airport Parkway Station to the new two storey MPT Luton Parkway Station (all matters reserved). Non - Material Amendment of planning permission 17/00283/FUL dated 7th July 2017. (This application is to retain as permanent, a modification to the taxi way as shown on drawings C12768-RPS-TWY-TU-DR-C-4122 Rev P2, and AGT/AGL/LTN/221 rev A).