Land At Water Lane Water Lane Frisby On The Wreake
Discharge of conditions 7 (surface water drainage scheme), 8 (management of surface water during construction), 9 (long term maintenance of surface water drainage system), 10 (assessment of groundwater levels), 11 (phase 2 ground investigation), 12 (finished floor levels), 16 (detailed access plan), 17 (highways design details), 18 (existing access closure), 19 (construction traffic management plan), 20 (construction traffic routing) of outline planning permission 16/00740/OUT.