Telecommunication Station Cotton Valley Sewage Works Portway Pineham Milton Keynes
28-Day Notification under the Electronic Communications Code Regulations of the intention to remove of the existing lattice mast; install a replacement mast with new 7.25 x 7.25 x 1.2m tower base; extend the existing compound with surrounding chainlink fence to accommodate the proposed replacement tower; remove 6 no. relocated antennas from the existing mast and install on the replacement 30.5m (mean height) mast and new circular headframe; install 3 no. new 20.95m (mean height) antennas on circular headframe; install 6 no. new 22.92m (mean height) antennas on new ring headframe; erect 2 no. GPS Nodes on new 3m gantry support posts; install 1 no. additional equipment cabinet at ground level on a new concrete base; and the installation of associated additional ancillary electronic communications apparatus including RRUs (Remote Radio Units), cable trays and Feeder Brackets