U C D Crew Lane Southwell NG25 0TX
Variation of conditions 1 and 5 attached to planning permission 21/00143/S73M Due to recent findings the power cables on east side and the anchor points has resulted in the need to reduce phase 2 and rotate the building. (Original permission was for Phased development of existing employment site including refurbishment of one existing building, erection of 3 new industrial buildings, external caravan and container storage, associated site access points alterations and external works)