Land Off Humberston Road Grimsby North East Lincolnshire
Details in Discharge of Conditions 3 (Surface Water), 4 (Highways), 5 (Residential Travel Plan), 7 (Open Space), 10 (Water Reuse), 11 (Foul Drainage), 12 (Landscaping), 13 (Levels) and 17 (Control Measures) following DM/0552/21/FUL