Parcel R10 Hampton Woods The Hamptons East Peterborough
Discharge of conditions C6 (haul route and construction access), C8 (tree retention plan), C9 (ripping details), C10 (soil verification phasing plan), C11 (contamination), C12 (contamination verification) and C15 (foul water) in relation to outline planning permission reference 16/02017/OUT