Tudor Grange Academy Kingshurst Cooks Lane Kingshurst Solihull B37 6NU
Pior notification to supply and install 970 No. photovoltaic solar panels with a maximum output of 373.45 kWp. The panels will be installed on the flat and pitched roof of the school building.