The London Power Tunnels II - Circuit 2 - New Cross To Hurst Southwark
Discharge of Schedule 2 (2) - "Environmental Assessment Report" (Basement Impact Assessment only) of the Section 106 agreement relating to planning permissions 18/AP/0463 and 18/AP/0464 (Request for a EIA Screening Opinion in respect of the proposed for London Power Tunnels Circuit 1 (Wimbledon to New Cross) including temporary works (a construction site of approximately 15,000sqm) and permanent works (one head-house approx 15m x 15m and 10m maximum height; 30m deep access shaft approx 15m diameter; and 3200m length of 4m diameter tunnel to Lambeth/Southwark boundary and a 10m length of 4m diameter tunnel to connect to Circuit 2).