The Beeches Hollyvale Marple Bridge Stockport SK6 5DQ
Construct a cantilever with a steel substructure to extend the existing garage plinth at floor level by two and a half metres into the property's curtilage. Move the existing sectional concrete double garage back into the curtilage thus revealing a parking space on the existing garage floor. Add steel steps to give access to the garage's rear door. (Alterations to existing detached garage)