Seashell Trust Royal School Manchester Stanley Road Heald Green Cheadle Stockport SK8 6RQ
Non-material amendment to DC/060928 comprising alterations to the detailed design of the new school building including amendments to the number, clerestory form and location of rooflights; minor reduction in canopy width to certain roof areas; detailed design of the size and location of roof plant; reduction of building height to parapets of pool and hall blocks by 600mm; minor internal floor layout changes to shared services block; minor elevation amendments to positioning of windows, doors, curtain walling, and louvres as a result of internal layout changes; and replacement of timber cladding on west/ east elevations for an opaque aluminium coated panel.