Stockport Town Hall Edward Street Stockport SK1 3XE
Provision of insulation to areas of uninsulated loftspace across the building or upgrading areas with insulation to increase thickness. Draught proofing to doors using stripping to adhered to frames. Installation of secondary glazing replacing older secondary glazing to a number of selected windows. New timber windows with conservation stype double glazed units to below street level windows to rear elevation. Mechanical and electrical enhancement works to include LED lighting upgrade, pipework insulation to boiler room, flow restrictors and general servicing to of heating/hot water plant and control gear. Installation of 2no air source heat pumps.