The Pepper Pot Caravan Park Lower Wick Dursley Gloucestershire GL11 6DD
Upgrade to 3 phase 11kv overhead line. Reconductor approx 2km of 25 Aluminium to 3 wire 25 copper and replace existing pole mounted apparatus at Swanley Farm and also the overhead apparatus at the Greyhound spur 12607.