Edes Business Park Restmor Way Hackbridge Wallington SM6 7AH
Proposed rooftop upgrade to the existing telecommunications installation. Removal and replacement of Existing 6x Antennas with Proposed 6x Antennas. Proposed installation of 12m Swann Stub Tower together with Delta Headframe on proposed steelwork, 1x 300 Dish and 1x 600 Dish and associated ancillary works. Relocation of existing 3x Antennas to new stub tower and Existing Equipment Cabin to be refreshed internally.