Invopak Hyde Point Dunkirk Lane Hyde Tameside SK14 4NL
The erection of two loading canopies to the south-facing and west-facing elevations; demolition of boiler room on the western elevation alongside demolition of an existing chimney with external alterations comprising installation of cladding, replacement downpipes, guttering and openings to all elevations and new roof