Land North Of Ashdon Road Ashdon Road Saffron Walden
Application to discharge condition 2 (materials), 3 (on-site foul water), 4 (surface water drainage), 14 (tree protection), 17 (construction management plan), 18 (construction traffic management) 19 (surface water infiltration), 20 (pollution control) and 22 (construction method statement) attached to UTT/20/0842/FUL.