Paragon Phase 2a is part of a wider development scheme that lays between Bradford Road and the A650 in Wakefield. To the south of Paragon Phase 2a is Phase 1 that has now been built out.
Discharge of condition 4 (a-Means of access), (b-External appearance), (c-Layout), (d-Scale), (e-Landscaping), (f-Site and floor levels), (i-Foul and surface water drainage), (k-Sustainable construction), (l-Lighting), (m-Bus stops) and (n-Parking management plan) from approved application 09/01248/OUT.