Pioneer Way (Site Off) Normanton
Discharge of conditions 4 (Construction method), 5 (Wheel Cleaning), 9 (No surface water to highway), 11 (CEMP), 12 Foul and surface water drainage), 13 Development flow runoff), 16 (Temporary drainage), 17 (Oil interceptor), 19 (Landscaping), 20 (Materials), 26 (Crime), Condition 27 (Energy statement) from approved application 16/00135/FUL.