Balne Lane Wakefield WF2 0DP
Discharge of Condition 3 (Surface Water), Condition 4 (Surface Flow Run-Off), Condition 8 (Drainage System) and Condition 9 (Surface Water- Discharge) from approved application 20/00103/FUL.