McLaren Production Centre Chertsey Road Woking Surrey
Submission of Details Pursuant to Condition 07 and 08 of PLAN/2019/0709 (Section 73 application for variation of conditions 02 (approved plans), 03 (hard surfaces), 04 (planting scheme), 05 (drainage strategy) and 06 (drainage drawings and method statement) of PLAN/2019/0139 dated 24.05.2019 (Development of a noise, vibration and harshness assessment area and area for the temporary storage of production line vehicles directly adjacent to the McLaren Production Centre, and all other necessary on-site works and infrastructure) to revise approved surface water drainage system design and landscaping).