Orchardside Nurseries Bullsmoor Lane Enfield EN1 4RL
Non-material amendment to ref:15/01788/RE4 to change high roof to lower roof (blue roof), discharge pipes identified, louvre ventilation requirements clarified and secret larch clad roof access door added to West elevation.
Astrazeneca Uk Ltd Cambridge Biomedical Campus Francis Crick Avenue Cambridge Cambridgeshire CB2 0AA
Non Material Amendment to Phase 1B Development of reserved matters application 19/1070/REM (Reserved matters application pursuant to outline approval 06/0796/OUT (amended by Section 73 approval 17/2258/S73) for: an R&D Enabling Building of 13,197 sqm; an Amenities Hub of 3,261 sqm; associated car, motorbike and cycle parking including a Multi Storey Car Park; a temporary Multi Use Games Area; hard and soft landscaping; and internal roads, supporting facilities and ancillary infrastructure. Includes partial discharge of conditions 13, 16, 18, 24, 25, 45, 47, 48, 49, 56, 57, 58 and 59 pursuant to outline consent 06/0796/OUT) to allow for alterations to the road layout, gas governor, layby, minor landscaping details and temporary construction of external storage for bins and generator external to the Travel Hub.
Land North Of Aston Clinton Road (Former Aston Clinton Road MDA Site) Weston Turville Buckinghamshire
Proposed non-material amendment to planning permission 18/01277/ADP (Approval of reserved matters (appearance, landscaping, layout and scale) for 146 dwellings and local centre retail unit pursuant to outline permission 15/03806/AOP Discharge of conditions 1, 7, 8, 9, 11, 12, 13, 14 and 30 in relation to Phase 1 as depicted on the Phasing Plan submitted as part of this application (drawing ref. BM32290-00-ZZ-DR-A-3_02-011), and full discharge of conditions 2, 6, and 18)
50 Clarendon Road Watford WD17 1TX
Non-material amendment to planning permission 17/01433/FULM for Condition 3 (Drainage)- A drainage strategy detailing any on and /or off site drainage works must be submitted to and approved by the local planning authority in consultation with the sewerage undertaker prior to completion of foundations. No discharge of foul or surface water from the site shall be accepted into the public system until the drainage works referred to in the strategy have been completed.