Royal United Services Institute For Defence Studies Whitehall London SW1A 2ET
Amendments to planning permission dated 2 March 2022 (RN:21/08243/FULL) for 'Variation of condition 1 of planning permission dated 25th August 2021 (RN 21/03822/FULL) which itself varied condition 1, condition 4 (part a) and condition 5 (parts i, iv and v) and the removal of Condition 4 (parts b and c), 5 (parts ii and iii) and 8 of planning permission dated 3 December 2020 (RN:20/03764/FULL) for 'Removal of existing roof top plant and extension to create an additional storey at fifth floor with tiled mansards and lead clad dormer windows to front and rear; a single storey extension at fourth floor comprising a glazed dome above the existing rear bow; installation of plant at roof level; partial infilling of lightwell adjacent to Gwydyr House; facade cleaning and other facade repairs; and other associated works in connection with the existing use (Sui Generis)'. Namely, amendments to the new fifth floor roof layout and increase front parapet height.
Royal United Services Institute For Defence Studies Whitehall London SW1A 2ET
Amendments to planning permission dated 02 March 2022 (21/08243/FULL) for 'Variation of condition 1 of planning permission dated 25th August 2021 (RN 21/03822/FULL) which itself varied condition 1, condition 4 (part a) and condition 5 (parts i, iv and v) and the removal of Condition 4 (parts b and c), 5 (parts ii and iii) and 8 of planning permission dated 3 December 2020 (RN:20/03764/FULL) for removal of existing roof top plant and extension to create an additional storey at fifth floor with tiled mansards and lead clad dormer windows to front and rear; a single storey extension at fourth floor comprising a glazed dome above the existing rear bow; installation of plant at roof level; partial infilling of lightwell adjacent to Gwydyr House; facade cleaning and other facade repairs; and other associated works in connection with the existing use (Sui Generis). Namely, amendments to the abutment of the roof extension with Banqueting House and alterations to the rear part of the mansard roof extension.' Namely, amendments to the new fifth floor roof layout, installation of dry riser inlet, and part cornice removal on rear elevation to facilitate the installation of the consented springing dome; and variation to the wording of condition 3 (materials) to a compliance condition.