119 Brighton Road Surbiton KT6 5NJ
Non-Material Amendment to Planning Permission ref: 17/16547/FUL (Demolition of the existing buildings and erection of a part 3 part 4 storey mixed use building with basement level car parking, ground floor office, and 19 residential apartments, with associated landscaping, refuse and cycle storage) dated 19/11/2018. Amendments to consist of changing to wording of Conditions 5 (Construction Management Plan) and 17 (Sustainable Drainage Design) to allow work to commence and information provided 6 weeks post the commencement of demolition
Kingstons House 15 Coombe Road Kingston Upon Thames KT2 7AB
Non Material Amendment to Planning Permission 19/01813/FUL (Variation of Condition 2 (Approved Drawings) of Planning Permission 15/12978/FUL (Demolition of existing office and ancillary building. Erection of part 3 part 6 storey building for 2,478sqm floorspace for a two form entry primary school for a maximum of 420 pupils including provision of double basement for double height sports hall and provision of a raised play deck; and 19 flats (5 no. 1 bedroom flats; 10 no. 2 bedroom units; 4 no. 3 bedroom units). Provision of up to 94 cycle stands.) to amend drawings to allow for elevational treatment changes, and internal layout changes) to provide changes to perforated brickwork, transoms, ground floor school play area and the removal of Condition 5b-Construction Management Plan (duplicate condition)
Kingstons House 15 Coombe Road Kingston Upon Thames KT2 7AB
Non-Material amendment to Planning Permission ref: 19/01813/FUL (Variation of Condition 2 (Approved Drawings) of Planning Permission 15/12978/FUL (Demolition of existing office and ancillary building. Erection of part 3 part 6 storey building for 2,478sqm floorspace for a two form entry primary school for a maximum of 420 pupils including provision of double basement for double height sports hall and provision of a raised play deck; and 19 flats (5 no. 1 bedroom flats; 10 no. 2 bedroom units; 4 no. 3 bedroom units). Provision of up to 94 cycle stands.) To amend drawings to allow for elevational treatment changes, and internal layout changes). Amendment to condition 5 to extend construction working hours for the weekend of the 3rd-4th July 2021 to 1300hrs to 1800hrs on Saturday and 0800hrs-1800hrs on Sunday.