Pinetrees Purdis Farm Lane Purdis Farm Ipswich Suffolk IP3 8UF
Non-material amendment to DC/22/2437/FUL (Demolition of existing bungalow, construction of 4 new dwellings and associated carports, parking, access and landscaping) - The first-floor gable window to Bedroom 3 has been removed in place of decorative timber gable frame panelling. The fixed window in the kitchen at the side elevation has been replaced by a set of French doors, of similar size. On the same elevation, the bi-fold doors in the living room have been removed. On the east elevation of the living room a set of sliding doors with gable window has been introduced in place of the fixed window and timber gable panelling.
Land Off Rushmere Road Carlton Colville NR33 8HA
Non Material Amendment of DC/21/2726/VOC - Variation of Condition 2 of DC/20/4921/FUL - Demolition of existing garage buildings and construction of 4 No. detached bungalows with garages, access road and associated hard and soft landscaping - Revision to Plot 1 including fenestration adjustment and incorporation of garden room to suit end user needs - Revision to Plot 1 including fenestration adjustment and incorporation of garden room to suit end user needs - Addition of French Doors to rear elevations & associated internal layout amendments.
Land Between 19 And 23 Ravensmere Beccles Suffolk
Non Material Amendment of DC/19/3749/VOC - Demolitions of existing workshop and shop and construction of 4 new dwellings and associated access parking and landscaping - 1. Installation of pv (solar) panels to the West (Rear) elevations of the 3 nr terraced houses and 1 nr bungalow. 2. Alteration of window construction to the 3 nr terraced houses from timber to uPVC (this was changed on the bungalow with NMA ref DC/20/3683/AME dated 18.09.2020) subject to the approval of the conservation officer. 3. To set back Unit 1 of Block A by 1.20m from the adjacent footway with Units 2 & 3 being as close to the footway as possible. 4. Change of all hard landscaping from permeable construction to an impermeable system discharging on site into a crated soakaway (subject to percolation tests to be submitted to building control). 5. A request to install the soil and vent stacks externally rather than internally to the 3nr houses and 1 nr bungalow.