Sharlowes Farm Flaunden Flaunden Hemel Hempstead Hertfordshire HP3 0PP
Non-material amendment to planning permission 22/02771/ROC Variation of conditions 2 (Tree protection plan); 3 (Remediation statement); 8 (Approved plans) attached to planning permission 4/01760/19/FUL (Demolition of building a & part of building b and the construction of a pair of semi-detached Dwellings.)
Luxborough Towers Luxborough Street London W1U 5BW
Amendments to planning permission dated 9th March 2023 (RN: 22/06526/COFUL) for Variation of conditions 1 and 15 of planning permission dated 19/11/2020 (RN 19/06451/COFUL) for the redevelopment of existing play space to provide a new building comprising a flexible Class D1 (non-residential institutions) use at ground floor level, 14 x affordable house units (7 x 1-bed and 7 x 2-bed) on first to fifth floors with associated terraces/balconies (Class C3); associated access and other works including a subterranean rainwater harvesting tank; new plant, cycle parking, refuse storage and landscaping. Removal of existing boundary railings and brick wall base adjoining Paddington Street Gardens North and construction of new boundary wall: NAMELY; to amend the wording of Condition 14 to allow for further works to two trees (T4 and T14).
Acton Gardens Phase 6.2 Bollo Bridge Road Acton W3 8RQ
Application for a Non Material Amendment (s.96a), to allow design alterations to the Central Plaza open space pursuant to planning permission 160793RES 24.05.2016 and 160794VAR dated 09.12.2016 for 'for "Minor material amendment application for variation of conditions 3 (approved drawings), 18 (tree protection), 28 (Lifetime Homes), 31 (BREEAM), 36 (provision of Central Plaza in construction programme) and 42 (non-residential floorspace) of outline planning permission P/2012/0708 dated 13/08/2012 (as amended by P/2014/2142 and P/2014/6303) to facilitate minor changes to building heights, development zones, ground floor uses and floorspaces, phasing, public open space for Phase 6 and tree retention strategy for Phases 5 and 6 of the South Acton Estate regeneration masterplan for 'Outline planning application (reserving Appearance; Means of Access; Landscaping; Layout and Scale for later determination) for the continued regeneration of the South Acton Estate comprising of the demolition of buildings locations specified in the site address (including residential units, 521sqm of retail shops, 2,434sqm of community/ office facilities, hotel, garages and associated areas) and the erection of a maximum of 2,350 residential units, a maximum of 1,050sqm of flexible A1 (retail) / A3 (restaurant and cafe) / B1 (office) / D1 (community) uses, of which 600sqm is to be A1 (retail) use, a further 2,348sqm of D1 (community) / B1 (office) space (to include a minimum of 926sqm for provision of a community centre and youth club), energy centre, alterations to allotments, re-sited and enhanced open space and play facilities, landscaping, highway works and 1,128 car parking spaces' (original application was EIA Application)'
Recreation Ground Leighton Road Wing Buckinghamshire
Proposed non-material amendment to permission for Variation of condition 2 (approved plans) 4 (landscaping) 7 (drainage) 11 (parking) 12 and 13 (vehicle splays) relating to application 19/04069/APP (Demolition of existing Bowls Clubhouse and construction of new pavilion. Reconfigured access, parking and waste facilities. New MUGA and junior football pitch. Expansion and remarking of existing grass football field. General landscape improvements including surface drainage, accessible trail and new trees) granted under planning approval ref: 22/02462/VRC
Barrington Cement Works Haslingfield Road Barrington Cambridge Cambridgeshire CB22 7RQ
Non material amendment of planning permission 21/01474/S73 (Variation of condition 2 (reserved matters details) pursuant to planning application 20/02528/S73 (Variation of conditions 2 (Reserved matters), 5 (Construction Environment Management Plan and a Construction Method Statement), 6 (Airborne Dust), 7 (Site waste management plan), 8 (Tree protection measures), 9 (Boundary Treatment), 10 (Siting and design of the screened storage for refuse), 14 (Renewable energy statement), 15 (Contamination), 16 (Noise insulation scheme or noise mitigation Strategy), 19 (Surface water drainage scheme), 20 (Surface water), 21 (Remediation Statement - Contamination), 22 (Scheme for disposal for surface water), 24 (Visibilty splays), 26 (Recording of Industrial Heritage), 27 (Foul water solution), 28 (Archaelogical works) and 29 (Fire hydrants) pursuant to planning permission S/0057/17/VC)) Change the block paving material
Acton Gardens Central Plaza Phase 6 Acton W3 8DA
Application for a Non-Material Amendment in (S96a) seeking to amend the timing trigger of Condition 36, in relation to planning permission reference 160794VAR dated 09.12.2016 for 'Minor material amendment application for variation of conditions 3 (approved drawings), 18 (tree protection), 28 (Lifetime Homes), 31 (BREEAM), 36 (provision of Central Plaza in construction programme) and 42 (non-residential floorspace) of outline planning permission P/2012/0708 dated 13/08/2012 (as amended by P/2014/2142 and P/2014/6303) to facilitate minor changes to building heights, development zones, ground floor uses and floorspaces, phasing, public open space for Phase 6 and tree retention strategy for Phases 5 and 6 of the South Acton Estate regeneration masterplan for 'Outline planning application (reserving Appearance; Means of Access; Landscaping; Layout and Scale for later determination) for the continued regeneration of the South Acton Estate comprising of the demolition of buildings locations specified in the site address (including residential units, 521sqm of retail shops, 2,434sqm of community/ office facilities, hotel, garages and associated areas) and the erection of a maximum of 2,350 residential units, a maximum of 1,050sqm of flexible A1 (retail) / A3 (restaurant and cafe) / B1 (office) / D1 (community) uses, of which 600sqm is to be A1 (retail) use, a further 2,348sqm of D1 (community) / B1 (office) space (to include a minimum of 926sqm for provision of a community centre and youth club), energy centre, alterations to allotments, re-sited and enhanced open space and play facilities, landscaping, highway works and 1,128 car parking spaces' (original application was EIA Application).'