Land And Buildings To The West Of Dean Cottage Dean Hall Lane Euxton PR7 6ER
Minor non-material amendment to planning permission ref: 23/00468/REM (Reserved matters application detailing access, appearance, landscaping, layout, and scale pursuant to outline planning permission ref: 19/01110/OUT (Outline planning application for the erection of a detached dwellinghouse, following the demolition of existing buildings. All matters reserved)) to amend the wording of condition no. 5 (site access) to allow works to commence in advance of formal discharge of the condition
South View Back Lane Mawdesley Ormskirk L40 3SY
Minor non-material amendment to planning permission 20/00556/FUL (Erection of 3no. detached dwellinghouses with associated detached garages and extension to retained stable block, following the demolition of an existing stable block and storage building) to amend the wording of conditions nos.6 (landscaping scheme), 7 (hard landscaping), 8 (boundary treatments) and 11 (dwelling emission rate) to allow the car port to be erected in advance of formal discharge of the conditions
64-66 And 70-88 Uxbridge Road Hanwell W7 3SU
Application for a Non-Material Amendment (S96a) to planning permission ref: 172913FUL granted on appeal ref: APP/A5270/W/18/3212646 dated 23/07/2019 for: Redevelopment to provide two buildings (demolition of the existing buildings) as a part four and nine storey building and a five storey building comprising a mixed use development of 679sqm of flexible uses retail ( class A1) and/or financial/professional services (class A2), and/or restaurant/café (class A3), and/or assembly and leisure (use class D2) and 59 residential units (including affordable housing); and associated cycle storage, public and private amenity spaces, refuse and recycling storage and hard & soft landscaping. Amendment proposes changes to wording and to allow conditions 3 (Demolition and Construction Management Plan), 4 (Materials), 9 (Intrusive Contaminated Land Investigation, Remediation Scheme), 10 (Waste Water (Thames Water)), 11 (Piling Method Statement (Thames Water), 14 (Insulation between ground floor commercial uses (A1, A2, A3, D2), plantroom and dwellings), 21 (Air Quality), 32 (Site Waste Management Plan and Green Procurement Plan), 33 (Energy Strategy for residential) and 34 (Energy Strategy for Non-residential) a phased approach towards both the delivery of the development, and the work associated with the discharge of conditions for each phase; amendments seeks greater flexibility in relation to the phasing of the S106 contributions