Dev Site At 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street And 30 Gloucester Place London
Amendments to planning permission dated 1st October 2021 (RN:20/06914/FULL) for Variation of conditions 1, 31 and 35 of planning permission dated 4 March 2020 (RN 19/06767/FULL) (amended by 20/05397/NMA) which permitted the following development : Demolition of the existing buildings at 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street and redevelopment to create a mixed use scheme providing commercial uses and up to 51 residential units within a new ground plus nine storey building (and an enclosed plant area) on Baker Street; a new stepped ground plus four to ground plus six storey building on George Street; refurbishment, extension and the change of use of the first floor from office to residential at 30 Gloucester Place; creation of a single storey basement level linking the Baker Street and George Street buildings to provide car and cycle parking, refuse and servicing; creation of a new central, publicly accessible courtyard; removal of 5 trees and replacement trees across the site, a new publicly accessible route at ground level connecting Baker Street and Gloucester Place; associated plant, landscaping, replacement pavements in part and other associated works. Namely, amendments to rooflights at Level 5 and 6 of the George Street residential building, and minor elevations alterations.
78 West Street And 7-8 Middle Street Brighton BN1 2RA
Non-Material Amendment to BH2020/03342 (original permission BH2015/04577) to amend the description of the development to 'Variation of Condition 1 of application BH2015/04577 (as amended by BH2018/00682 and BH2018/01013) [Demolition of existing nightclub buildings. Construction of mixed use building of up to 7 storeys to provide hotel, retail, financial & professional services, restaurant/cafe and drinking establishment uses] to allow substitute drawings for hotel use on all floors, flexible retail/financial and professional services/restaurant and cafe/bar uses at ground floor, alterations to all elevations, reduction in the height of the building, and extensions/alterations at 5th/6th floor level'.
136 Freshfield Road Brighton BN2 0BR
Non-Material Amendment to application BH2019/03037 to amend the description of development to 'Application for variation of Condition 1 of application BH2018/02114 (Change of use & conversion of vacant public house (A4) incorporating the erection of 3 storey extension & associated works to create 3no. two bedroom flats (C3) with separate external amenity spaces, plus provision of office space (B1) and Café (A3)) to permit alterations to windows and rooflights and removal of chimney'.
127-133 Charing Cross Road London WC2H 0EA
Amendments to planning permission dated 23 May 2022 (RN: 21/07685/FULL) for variation of conditions 1, 14 and 17 of planning permission dated 29 August 2019 (RN:19/00531/FULL) for: Refurbishment and extensions to existing building including replacement of external facades; three additional floors at roof level plus rooftop access housing and plant enclosure; and terraces at second to seventh floor level; to provide retail (Class A1), office (Class B1) and nightclub (Sui Generis) floorspace, to allow changes to the rooftop plant enclosure, improvements to cycle storage space, amendments to the waste stores, revised massing at first to fourth floor level on the Goslett Yard elevation and changes to the approved facing materials. Namely, to amend the description of development to read as follows: Amendments to planning permission dated 23 May 2022 (RN: 21/07685/FULL) for variation of conditions 1, 14 and 17 of planning permission dated 29th August 2019 (RN:19/00531/FULL) for the refurbishment and extensions to existing building including replacement of external facades; three additional floors at roof level plus rooftop access housing and plant enclosure; and terraces at second to seventh floor level; to provide commercial, business and service uses and nightclub (Sui Generis) floorspace.
West Yorkshire Police Stephenson Way Wakefield WF2 0XY
Non-material amendment to approved application 20/00639/FUL dated 05.08.2020 (Extension to yard area and creation of additional car parking areas) [as amended by 20/00639/NMC01 which introduced a phasing plan] comprising minor alteration to construction details, repositioning of proposed fenceline to east site boundary and revised drainage infrastructure to enable the development to come forward on a phased basis together with the variation of conditions 2 (approved plans) and 10 (drainage) to insert the revised plan(s).
148 London Road High Wycombe Buckinghamshire HP11 1DQ
Proposed non-material amendment to permission Variation of condition 3 (plans) attached to 20/06610/VCDN (Outline application (Including siting, design, external appearance and means of access onto London Road) for extension and conversion of existing HMO to form residential development of 4 flats, with associated parking, amenity areas, bin and cycle storage) to allow for addition of 4 x flat roof dormers to the rear of the property granted under planning ref:21/07612/VCDN
Dev Site At 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street And 30 Gloucester Place London
Amendments to planning permission dated 1st October 2021 (RN:20/06914/FULL) for Variation of conditions 1, 31 and 35 of planning permission dated 4 March 2020 (RN 19/06767/FULL) (amended by 20/05397/NMA) which permitted the following development : Demolition of the existing buildings at 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street and redevelopment to create a mixed use scheme providing commercial uses and up to 51 residential units within a new ground plus nine storey building (and an enclosed plant area) on Baker Street; a new stepped ground plus four to ground plus six storey building on George Street; refurbishment, extension and the change of use of the first floor from office to residential at 30 Gloucester Place; creation of a single storey basement level linking the Baker Street and George Street buildings to provide car and cycle parking, refuse and servicing; creation of a new central, publicly accessible courtyard; removal of 5 trees and replacement trees across the site, a new publicly accessible route at ground level connecting Baker Street and Gloucester Place; associated plant, landscaping, replacement pavements in part and other associated works. NAMELY; for the installation of planters to the Juliet balconies at first and second floors along George Street.
104 King Street London W6 0QW
Non-material amendment to planning permission (ref: 2021/01039/VAR) dated 3 February 2022, for the development: 'Variation of Condition 2 (approved drawings) to allow minor material amendments to planning permission (ref: 2020/00646/FUL) dated 24 November 2020, for "The redevelopment of the site comprising the demolition and removal of the existing timber shed buildings, the retention of the existing office and former recording studio buildings and the development of part-basement, part-1, part-2, part-3 storey buildings, refurbishment of the office building and development of a first floor extension to the recording studio; to be used as office (Use Class B1), associated access works and cycle parking spaces'. In conjunction with minor external and internal alterations to the approved buildings, the amendments include: installation of new windows on south elevation and the reconfiguration of the plant enclosure at roof level (Block A), increase in parapet heights (infill elements) and reconfiguration to provide a brick clad boundary wall with the Cambridge Grove properties (Block B); and alterations to provide an enclosed bike store fronting Cambridge Grove (Building C).". Amendments sought relate to changes to the landscaping scheme (condition 27) by way of the addition of trees and landscaping.
Dev Site At 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street And 30 Gloucester Place London
Amendments to planning permission dated 1st October 2021 (RN:20/06914/FULL) for, 'Variation of conditions 1, 31 and 35 of planning permission dated 4 March 2020 (RN 19/06767/FULL) (amended by 20/05397/NMA) which permitted the following development : Demolition of the existing buildings at 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street and redevelopment to create a mixed use scheme providing commercial uses and up to 51 residential units within a new ground plus nine storey building (and an enclosed plant area) on Baker Street; a new stepped ground plus four to ground plus six storey building on George Street; refurbishment, extension and the change of use of the first floor from office to residential at 30 Gloucester Place; creation of a single storey basement level linking the Baker Street and George Street buildings to provide car and cycle parking, refuse and servicing; creation of a new central, publicly accessible courtyard; removal of 5 trees and replacement trees across the site, a new publicly accessible route at ground level connecting Baker Street and Gloucester Place; associated plant, landscaping, replacement pavements in part and other associated works'. Namely, Works to the building, including changes to the East Elevation façade including additional non-openable windows, changes to the layout of the ground floor retail units, refurbishment of the roof, and other associated works
Development Site At 14 To 17 Paddington Green London
Amendments to planning permission dated 5th January 2023 (RN:22/03790/FULL) for Variation of condition 1 of planning permission dated 29 March 2019 (RN: 18/08004/FULL), which itself Varied condition 1 of planning permission dated 21 December 2017 (RN: 16/11562/FULL) for the Demolition and redevelopment of 14-16 Paddington Green; alteration and partial demolition of 17 Paddington Green; development of land to the east and south of 14-17 Paddington Green (part of site known as 'West End Green') to provide buildings ranging between 4 and 15 upper storeys to provide residential units, with associated landscaping, basement car and cycle parking and servicing provision. NAMELY the removal of the loggia/covered walkway area between Blocks G and H, the re-design of the layout of the restaurant at the ground floor of Block H and design changes to the façade/elevation of the restaurant extension.