Dev Site At 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street And 30 Gloucester Place London
Amendments to planning permission dated 1st October 2021 (RN:20/06914/FULL) for Variation of conditions 1, 31 and 35 of planning permission dated 4 March 2020 (RN 19/06767/FULL) (amended by 20/05397/NMA) which permitted the following development : Demolition of the existing buildings at 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street and redevelopment to create a mixed use scheme providing commercial uses and up to 51 residential units within a new ground plus nine storey building (and an enclosed plant area) on Baker Street; a new stepped ground plus four to ground plus six storey building on George Street; refurbishment, extension and the change of use of the first floor from office to residential at 30 Gloucester Place; creation of a single storey basement level linking the Baker Street and George Street buildings to provide car and cycle parking, refuse and servicing; creation of a new central, publicly accessible courtyard; removal of 5 trees and replacement trees across the site, a new publicly accessible route at ground level connecting Baker Street and Gloucester Place; associated plant, landscaping, replacement pavements in part and other associated works. Namely, amendments to rooflights at Level 5 and 6 of the George Street residential building, and minor elevations alterations.
Acton Gardens Phase 6.2 Bollo Bridge Road Acton W3 8RQ
Application for a Non Material Amendment (s.96a), to allow design alterations to the Central Plaza open space pursuant to planning permission 160793RES 24.05.2016 and 160794VAR dated 09.12.2016 for 'for "Minor material amendment application for variation of conditions 3 (approved drawings), 18 (tree protection), 28 (Lifetime Homes), 31 (BREEAM), 36 (provision of Central Plaza in construction programme) and 42 (non-residential floorspace) of outline planning permission P/2012/0708 dated 13/08/2012 (as amended by P/2014/2142 and P/2014/6303) to facilitate minor changes to building heights, development zones, ground floor uses and floorspaces, phasing, public open space for Phase 6 and tree retention strategy for Phases 5 and 6 of the South Acton Estate regeneration masterplan for 'Outline planning application (reserving Appearance; Means of Access; Landscaping; Layout and Scale for later determination) for the continued regeneration of the South Acton Estate comprising of the demolition of buildings locations specified in the site address (including residential units, 521sqm of retail shops, 2,434sqm of community/ office facilities, hotel, garages and associated areas) and the erection of a maximum of 2,350 residential units, a maximum of 1,050sqm of flexible A1 (retail) / A3 (restaurant and cafe) / B1 (office) / D1 (community) uses, of which 600sqm is to be A1 (retail) use, a further 2,348sqm of D1 (community) / B1 (office) space (to include a minimum of 926sqm for provision of a community centre and youth club), energy centre, alterations to allotments, re-sited and enhanced open space and play facilities, landscaping, highway works and 1,128 car parking spaces' (original application was EIA Application)'
922 - 930 Purley Way Purley CR8 2JL
Non-material amendment (removal of part f of condition 41) linked to planning permission 22/01141/CONR for Variation of Conditions 2 (plans), 3 (detailed description), 11 (Fire statement), 17 and 18 (soft landscaping), 26 (refuse storage and cycle parking), 28 (energy statement), 34 (air quality), 36 (trees) and 37 (wheelchair accessible dwellings) of planning permission 20/06224/FUL for the 'Demolition of existing residential dwellings and erection of a residential development, with associated landscaping, access, cycle and car parking.
Dev Site At 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street And 30 Gloucester Place London
Amendments to planning permission dated 1st October 2021 (RN:20/06914/FULL) for Variation of conditions 1, 31 and 35 of planning permission dated 4 March 2020 (RN 19/06767/FULL) (amended by 20/05397/NMA) which permitted the following development : Demolition of the existing buildings at 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street and redevelopment to create a mixed use scheme providing commercial uses and up to 51 residential units within a new ground plus nine storey building (and an enclosed plant area) on Baker Street; a new stepped ground plus four to ground plus six storey building on George Street; refurbishment, extension and the change of use of the first floor from office to residential at 30 Gloucester Place; creation of a single storey basement level linking the Baker Street and George Street buildings to provide car and cycle parking, refuse and servicing; creation of a new central, publicly accessible courtyard; removal of 5 trees and replacement trees across the site, a new publicly accessible route at ground level connecting Baker Street and Gloucester Place; associated plant, landscaping, replacement pavements in part and other associated works. NAMELY; for the installation of planters to the Juliet balconies at first and second floors along George Street.
104 King Street London W6 0QW
Non-material amendment to planning permission (ref: 2021/01039/VAR) dated 3 February 2022, for the development: 'Variation of Condition 2 (approved drawings) to allow minor material amendments to planning permission (ref: 2020/00646/FUL) dated 24 November 2020, for "The redevelopment of the site comprising the demolition and removal of the existing timber shed buildings, the retention of the existing office and former recording studio buildings and the development of part-basement, part-1, part-2, part-3 storey buildings, refurbishment of the office building and development of a first floor extension to the recording studio; to be used as office (Use Class B1), associated access works and cycle parking spaces'. In conjunction with minor external and internal alterations to the approved buildings, the amendments include: installation of new windows on south elevation and the reconfiguration of the plant enclosure at roof level (Block A), increase in parapet heights (infill elements) and reconfiguration to provide a brick clad boundary wall with the Cambridge Grove properties (Block B); and alterations to provide an enclosed bike store fronting Cambridge Grove (Building C).". Amendments sought relate to changes to the landscaping scheme (condition 27) by way of the addition of trees and landscaping.
Dev Site At 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street And 30 Gloucester Place London
Amendments to planning permission dated 1st October 2021 (RN:20/06914/FULL) for, 'Variation of conditions 1, 31 and 35 of planning permission dated 4 March 2020 (RN 19/06767/FULL) (amended by 20/05397/NMA) which permitted the following development : Demolition of the existing buildings at 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street and redevelopment to create a mixed use scheme providing commercial uses and up to 51 residential units within a new ground plus nine storey building (and an enclosed plant area) on Baker Street; a new stepped ground plus four to ground plus six storey building on George Street; refurbishment, extension and the change of use of the first floor from office to residential at 30 Gloucester Place; creation of a single storey basement level linking the Baker Street and George Street buildings to provide car and cycle parking, refuse and servicing; creation of a new central, publicly accessible courtyard; removal of 5 trees and replacement trees across the site, a new publicly accessible route at ground level connecting Baker Street and Gloucester Place; associated plant, landscaping, replacement pavements in part and other associated works'. Namely, Works to the building, including changes to the East Elevation façade including additional non-openable windows, changes to the layout of the ground floor retail units, refurbishment of the roof, and other associated works
Dev Site At 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street And 30 Gloucester Place London
Amendments to planning permission dated 01 October 2021 (RN: 20/06914/FULL) for the: Variation of conditions 1, 31 and 35 of planning permission dated 4 March 2020 (RN 19/06767/FULL) (amended by 20/05397/NMA) which permitted the following development : Demolition of the existing buildings at 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street and redevelopment to create a mixed use scheme providing commercial uses and up to 51 residential units within a new ground plus nine storey building (and an enclosed plant area) on Baker Street; a new stepped ground plus four to ground plus six storey building on George Street; refurbishment, extension and the change of use of the first floor from office to residential at 30 Gloucester Place; creation of a single storey basement level linking the Baker Street and George Street buildings to provide car and cycle parking, refuse and servicing; creation of a new central, publicly accessible courtyard; removal of 5 trees and replacement trees across the site, a new publicly accessible route at ground level connecting Baker Street and Gloucester Place; associated plant, landscaping, replacement pavements in part and other associated works. NAMELY, to allow alterations to facade of 19- 35 Baker Street- Baker Street Office Building (Building C) at ground, first, fifth, sixth, seventh, eighth and roof level; amendments to 88-110 George Street, including 112 George Street (Building D) at lower ground floor, ground floor, first, fifth, sixth, seventh, eight and roof level; and changes to condition 42 to read : "You must apply to us for approval of a detailed external lighting strategy which includes details of all light fittings and lighting levels. You must not start any work on this part of the development until we have approved what you have sent us. You must then install all lighting in accordance with the approved external lighting strategy".
Cruet House Hollins Lane Hampsthwaite HG3 2HH
Non material amendment to planning approval 20/01040/REM - Reserved matters application for the erection of 5 no. residential dwellings (appearance, layout, scale, landscaping considered) under permission 20/00869/DVCON: Variation of conditions 4 (parameters plan), 7 (access), 20 (trees) of Planning Permission 16/05517/OUT - Outline planning application for the development of 5 no. residential dwellings with access considered to allow the for block paving to units 1,2, 3, 4 + 5.
Cruet House Hollins Lane Hampsthwaite HG3 2HH
Non material amendment to planning approval 20/01040/REM - Reserved matters application for the erection of 5 no. residential dwellings (appearance, layout, scale, landscaping considered) under permission 20/00869/DVCON: Variation of conditions 4 (parameters plan), 7 (access), 20 (trees) of Planning Permission 16/05517/OUT - Outline planning application for the development of 5 no. residential dwellings with access considered to allow the removal of external timber cladding to front elevation of unit 2; removal of timber cladding from front and rear elevation of unit 4; alteration of rear garage door to be black to match windows of units 2 and 4; rear garage door to be anthracite to match windows of units 1, 3 and 5; and alterations to canopy material to timber cladding to match the approved timber cladding on all 5 units.
Acton Gardens Central Plaza Phase 6 Acton W3 8DA
Application for a Non-Material Amendment in (S96a) seeking to amend the timing trigger of Condition 36, in relation to planning permission reference 160794VAR dated 09.12.2016 for 'Minor material amendment application for variation of conditions 3 (approved drawings), 18 (tree protection), 28 (Lifetime Homes), 31 (BREEAM), 36 (provision of Central Plaza in construction programme) and 42 (non-residential floorspace) of outline planning permission P/2012/0708 dated 13/08/2012 (as amended by P/2014/2142 and P/2014/6303) to facilitate minor changes to building heights, development zones, ground floor uses and floorspaces, phasing, public open space for Phase 6 and tree retention strategy for Phases 5 and 6 of the South Acton Estate regeneration masterplan for 'Outline planning application (reserving Appearance; Means of Access; Landscaping; Layout and Scale for later determination) for the continued regeneration of the South Acton Estate comprising of the demolition of buildings locations specified in the site address (including residential units, 521sqm of retail shops, 2,434sqm of community/ office facilities, hotel, garages and associated areas) and the erection of a maximum of 2,350 residential units, a maximum of 1,050sqm of flexible A1 (retail) / A3 (restaurant and cafe) / B1 (office) / D1 (community) uses, of which 600sqm is to be A1 (retail) use, a further 2,348sqm of D1 (community) / B1 (office) space (to include a minimum of 926sqm for provision of a community centre and youth club), energy centre, alterations to allotments, re-sited and enhanced open space and play facilities, landscaping, highway works and 1,128 car parking spaces' (original application was EIA Application).'