104 King Street London W6 0QW
Non-material amendment to planning permission (ref: 2021/01039/VAR) dated 3 February 2022, for the development: 'Variation of Condition 2 (approved drawings) to allow minor material amendments to planning permission (ref: 2020/00646/FUL) dated 24 November 2020, for "The redevelopment of the site comprising the demolition and removal of the existing timber shed buildings, the retention of the existing office and former recording studio buildings and the development of part-basement, part-1, part-2, part-3 storey buildings, refurbishment of the office building and development of a first floor extension to the recording studio; to be used as office (Use Class B1), associated access works and cycle parking spaces'. In conjunction with minor external and internal alterations to the approved buildings, the amendments include: installation of new windows on south elevation and the reconfiguration of the plant enclosure at roof level (Block A), increase in parapet heights (infill elements) and reconfiguration to provide a brick clad boundary wall with the Cambridge Grove properties (Block B); and alterations to provide an enclosed bike store fronting Cambridge Grove (Building C).". Amendments sought relate to changes to the landscaping scheme (condition 27) by way of the addition of trees and landscaping.
Cowshed Glen Farm Sandy Lane Lower Failand
Minor material amendment to vary condition 2 (approved plans), of permission 20/P/0684/FUL (Change of use of redundant agricultural building (cow shed) to residential use, demolition of existing agricultural building and construction of new bat house) to demolish a small section of the building to create a 1 metre gap between buildings, to revise fenestration and to allow the substitution of a revised Ecological Mitigation and Enhancement Plan. Variation of condition 3 (Ecological Mitigation and Enhancement Plan) to remove reference to the provision of specialist glass and condition 5 (External Lighting) to refer to the submitted lighting strategy and for the proposal to be implemented in accordance with the plans