7 Eastfield Close Southbourne Emsworth West Sussex PO10 8NJ
Discharge of conditions 4 (materials) 5 (Sustainable design and construction) 7 (Cycle Parking) 8 (Refuse and Recycling Storage) and 10 (Landscaping) from planning permission SB/20/02526/FUL.
Five Elms Stumps Lane Bosham Chichester West Sussex PO18 8QJ
Discharge of conditions 2 (Construction methos statement) Condition 3 (surface water drainage report)Condition 4 (levels) Condition 5 (landscaping) and Condition 6 (ecological report) from planning permission BO/23/00595/FUL
Ferry Farm Solar Farm Chichester Road Selsey West Sussex
Discharge of Conditions 3 (CEMP), 4 (landscape details), 5 (watercourse buffers) and 8 (construction road wearing course) of planning permission SI/21/01816/FULEIA.
South Mundham Farm South Mundham Road South Mundham West Sussex PO20 1LU
Discharge of conditions 6 (sustainable design and construction), 13 (porous materials), 14 (boundary treatments), 15 (EV charging point), 16 (hard and soft landscape works), 17 ( covered and secure cycle parking spaces), 18 (vehicle parking and turning), 19 (refuse and recycling) and 20 (demolition) of permission 19/00677/FUL.
22A Lavant Road Chichester West Sussex PO19 5RG
Discharge of Conditions 3 (CEMP) , 4 (tree protective fencing details), 5 (tree ground protection measures), 6 (surface water drainage scheme) , 7 (asbestos survey) , 8 (soft landscaping scheme), 9 (hard landscaping scheme) and 16 (boundary treatments) of planning permission CC/20/01897/FUL. DOC SUMMARY FIGURES 1 TO 3 ARBTECH AMS ARBTECH TPP03 CONSTRUCTION ARBTECH TPP03 DEMOLITION C2063 FW AND SW DRAINAGE REPORT SI 1872 ASBESTOS REPORT
Parcel 6I Land West Of Centurion Way And West Of Old Broyle Road Old Broyle Road Chichester West Sussex
Partial discharge of Conditions 5 (Construction and Environment Management Plan), 8 (Ecological Construction Management Plan), 9 (Landscape and Ecological Management Plan), 20 & 21 (Noise Mitigation Scheme), 25 (Sections and Levels), 26 (Materials Schedule and Samples) and 32 (Program of Ecological Mitigation/Implementation) of outline permission CC/14/04301/OUT (in respect of Phase 6i).