Meridian Water Willoughby Lane And Meridian Way London N18
Details pursuant to ref: 16/01197/RE3 for Conditions 4 (Phasing Plan), 10 (Remediation) (PARTIAL DISCHARGE), 11 (Remediation Verification Report) (PARTIAL DISCHARGE), 14 (Public Realm Strategy), 15 (Construction Environmental Management Plan Site Prep), 17 (Construction Environmental Management Plan), 18 (Construction Environmental Management Plan per Phase), 19 (Construction Logistics Plan), 29 (Green Procurement Plan), 30 (Implementation Plan and Verification Methods) (PARTIAL DISCHARGE), 35 (Surface Water and Drainage Management Plan), 42 (Drainage Strategy), 43 (Sustainable Drainage Details), 46 (Water Supply Infrastructure Impact Study), 47 (Archaeology), 59 (Strategy for Clearance of Slow Worms), 60 (Bat and Badger Checks), 61 (Hedge and Shrub Clearance), 62 (Eradication Strategy for Invasive Species), 71 (Cycle Parking), 74 (Highway and Footway Details), 82 (Construction Waste Management Plan), 83 (Waste Management Plan) and 86 (Wind Assessment) for the Main Site and discharge of planning Conditions 125 (Construction Management Plan), 126 (Construction Logistics Plan), 128 (Green Procurement Plan), 129 (Drainage Details), 130 (Sustainable Drainage Details), 134 (Landscaping Details), 136 (Strategy for Clearance of Slow Worms), 137 (Bat/ Badger Checks), 138 (Hedge and Shrub Clearance), 139 (Eradication Strategy for Invasive Species), 140 (Cycle Parking), 141 (Highway and Footway Details), 142 (Station Access Road Management Plan), 143 (Construction Waste Management Plan) and 144 (CCTV Provision) for the Station Public Realm Site only in relation to the Outline Planning Permission ref: 16/01197/RE3 for the Phase 1 Meridian Water development.
1B Duck Lees Lane Enfield EN3 7UH
Details pursuant to Ref: 23/02082/FUL for construction traffic management plan (9) in respect of the conversion of single family dwelling house into 2 dwelling houses, involving roof extension with rear dormer and single storey side and rear extensions.
41-52 Gilda Avenue Enfield EN3 7UJ
Details pursuant to Ref: 20/01815/FUL for construction management plan (CMP) (21) in respect of the demolition of the existing buildings to provide three buildings comprising residential dwellings (Class C3), new pedestrian link to Mollison Avenue, associated landscaping, car parking and amenity space.
11 Carterhatch Road Enfield EN3 5LS
Details pursuant to ref: 21/03994/FUL: water consumption (8), for sub-division of the site and construction of an end of terraced 2-storey, 3-bed dwelling house with demolition of garage at side, single storey rear extension and roof extension involving hip-gable extension and rear dormer window.
2 Tudor Crescent Enfield EN2 0TU
Details pursuant to ref: 19/03564/FUL for construction management plan (3) in respect of the sub-division of site and erection of a two storey residential dwelling for use as house in multiple occupation (HMO) (C4) for up to 6 people, involving basement level and refuse storage.
63 And 65 And Rear Of 59-65 Bramley Road London N14 4HA
Details pursuant to Ref: 21/04804/FUL for materials (3) enclosure (5) method statement (8) cycle space details (9) refuse storage and recycling (10) potable water (11) footway/vehicle crossover (15) in respect of the redevelopment of site involving demolition of Nos.63 & 65 Bramley Road, construction of a new road and erection of 8Nos. single family dwellings with associated landscaping, amenity space, bin storage and cycle parking.
New Avenue Estate, Including Shepcot House, Beardow Grove, Coverack Close, Oakwood Lodge, Garages To The Rear Of The Lousada Lodge, Hood Avenue Open Space And Cowper Gardens Open Space, London, N14.
Details pursuant to ref: 20/00037/VAR for external lighting (9 - Phase 2) in respect of Variation of condition granted under planning application 16/01578/FUL (as amended by 18/02662/NMA and 19/03917/NMA for drawings (3) levels (5), materials (8), parking and turning areas (14), privacy screens (26), drainage (28) and unit mix and numbers (53), and removal of condition 11 (accommodation schedule) and condition 44 (former mews site) in relation to the Demolition of Shepcot House, Oakwood Lodge, Beardow Grove, Coverack Close and garages rear of Lousada Lodge and phased redevelopment of site involving construction of new road to provide new residential accommodation (Class C3) within a mix of buildings up to 9 storeys, erection of a nursery and community building (Class D1), construction of an energy centre, formation of play space including play area at Cowper Gardens open space and provision of surface and undercroft car parking spaces. The minor material amendments include: increase in residential units numbers, alterations to unit mix, changes to the design of Blocks A1, A2, A3, A4, B1, B2, C1, D1, D2, D3, D4, E1, E2 and removal of Block E3, changes to tenure of blocks, amendments to building heights, landscaping and play provision and parking and cycle parking in relation to Phases 2 and 3.
Chase House 305 Chase Road London N14 6JS
Details pursuant to Ref: 19/00591/FUL for contamination 1 (4) contamination 2 (5) in respect of the erection of a five-storey rear extension to the existing building to provide 9 self contained flats comprising 4 x 1 beds, 2 x 2 beds, 3 x 3 beds, and construction of two additional floors to create a five storey building to provide new office floorspace (use class B1a), together with re-cladding of building, alterations to window openings and the provision of associated cycle storage, reconfigured car parking, refuse storage and landscaping.
51 Eversley Crescent And 151 Green Dragon Lane N21
Details pursuant to Ref: 21/02209/FUL for demolition and construction management plan (3) arboricultural method statement (AMS) (4) materials (7) energy statement (8) contamination (remediation) (9 part only) in respect of demolition of existing buildings and phased redevelopment of site by erection of two detached dwellinghouses with basements and ancillary works.
Alma Estate EN3
Details pursuant to ref: 19/03834/RM: SUDs Strategy (2) for Details pursuant to condition 5 of outline planning permission ref: 15/2039/OUT and as amended by 17/04670/VAR, and proposed variation by 19/03624/VAR in respect of layout, scale, appearance, access, landscaping in relation to Phases 2A and 4 of Alma Estate for the construction of 3 apartment buildings and 13 houses varying between 3 and 7 storeys in height, comprising 303 residential units in total, Class A1 retail units uses and provision of public open space, private and semi-private amenity space, refuse/recycling and bicycle storage, on and off street car parking together with conditions for tree protection (9), ecology and biodiversity strategy (31), drainage strategy (35), green roofs (36), living walls (37), energy strategy (38), green procurement plan (43), SWMP (44), parking (52), loading/unloading (54), delivery and servicing (57), car park management (58), traffic calming (59), cycle parking (60).