11 Carterhatch Road Enfield EN3 5LS
Details submitted pursuant to reference 21/03994/FUL: energy statement (4), enclosure (5), refuse and recycling storage (6), cycle parking (7) and SuDS (9) in respect of sub-division of the site and construction of an end of terraced 2-storey, 3-bed dwelling house with demolition of garage at side, single storey rear extension and roof extension involving hip-gable extension and rear dormer window.
Land To The Rear Of 102-104 First Avenue Enfield EN1 1BP
Details pursuant to ref: 20/02039/FUL: Construction Management Plan (3), external finishing materials (4), external fenestrations (5), landscaping (6), biodiversity enhancements (7), Energy Statement (8), potable water (10), cycle parking (13), refuse storage facilities (14), M4(2) (15), ground levels (17), green roof (18), surfacing materials (20), for the sub-division of site and erection of a pair of semi-detached dwellings with associated cycle parking and landscaping.
221 Holtwhites Hill Enfield EN2 8BX
Details submitted pursuant to reference 20/02041/FUL: construction management plan (8) and solar panels and energy savings (16) in respect of redevelopment of site and erection of 2 storey block of 8 self-contained flats (Use Class C2) with rooms in roof involving associated parking and landscaping.
65B Old Park Road London N13 4RG
Details pursuant to ref: 21/01243/FUL: materials (3), for the construction of new walkway above roof involving handrail and balustrade.
9 Viga Road London N21 1HH
Details pursuant to ref: 21/01509/FUL: external finishing materials (3) obscure glazing (4), Construction Methodology (5), energy statement (6), enclosure (7), landscaping (9), refuse storage facilities (10), cycle parking (11), potable water (12), SUDS (13) for the sub-division of site and conversion of single family dwelling house into 2 semi-detached single family dwelling houses, involving part single, part 2 storey side and rear extension, together with 2 x rear dormers to facilitate a roof extension, rooflights, Juliet balconies together with vehicular access, associated cycle, car parking and refuse
Kingswood Clay Hill Enfield EN2 9JB
Details pursuant to ref: 21/00671/HOU: Drainage (3), Landscaping Plan (5), Surfacing Materials (6) for Refurbishment of property including demolition of various outbuildings, and entrance gates, construction of outbuildings to include swimming pool, gym and games room, renovation and partial reconstruction of the existing boundary wall on Clay Hill and replacement of the entrance gate together with internal refurbishment of main house including balcony to the existing rear extension sloped roof, guest house external alterations and landscaping.
Land Rear Of 184 Chase Side London N14 5HN
Details submitted pursuant to reference 18/04262/FUL: external finishing materials (3), surfacing materials (4), enclosure (5), construction management plan (7), energy statement (10), sustainable drainage (12), drainage (13) and tree protection (16) in respect of erection of 2 x 4 bed single family dwellings with rooms in roof together with access via Lewis Close.
Hobart Court 51 The Bourne London N14 6EX
Details submitted pursuant to conditions No.4 (Arboricultural Report and Method Statement), No.5 (Delivery and Service Plan), No.10 (Green Procurement and Construction Plan) and No.11 (Sustainable Drainage Strategy) of consent No.19/01614/FUL in respect of the creation of a rooftop extension to provide an additional 7 self-contained flats within a mansard roof comprising (3 x 1 bed, 3 x 2 bed and 1 x 3 bed) involving accommodation within the existing tower and external alterations.
74 Broad Walk London N21 3BX
Details submitted pursuant to reference 21/00648/FUL: construction management plan (13 ) in respect of redevelopment of site by the demolition of the existing dwelling and erection of a replacement detached 2-storey single family dwelling house with accommodation in roof space
Northside House Mount Pleasant EN4 9EE
Details pursuant to ref: 19/01330/FUL: finishing materials (3), Construction Management Plan (4), cycle parking (5), for the roof extensions to provide additional office space on fourth and second floors and provision of new car parking layout.