Meridian Water Willoughby Lane And Meridian Way London N18
Details submitted pursuant to reference 20/03821/RM: podium landscape scheme (8) in respect of details of reserved matters (scale, layout, external appearance and landscaping) for 300 units in respect Plots E and A (Phase 1a) arranged across buildings from 3 to 12 storeys in height pursuant to condition 5 of planning permission 16/01197/RE3 dated 10 July 2017 for development of Phase 1 of Meridian Water comprising up to 725 residential units, new station building, platforms and associated interchange and drop-off facilities including a pedestrian link across the railway, a maximum of 950 sqm retail (A1/A2/A3), floorspace, a maximum of 600 sqm of community (D1) floorspace, a maximum of 750 sqm of leisure (D2) floorspace, associated site infrastructure works including ground and remediation works, roads, cycle-ways and footpaths, utility works above and below ground, surface water drainage works, energy centre and associated plant, public open space and childrens play areas, and various temporary meantime uses without structures (landscaping and open space). Application includes details pursuant to condition 29 (green procurement plan), condition 63 (biodiverse roof details), condition 65 (Energy statement), condition 86 (wind assessment), condition 71 (cycle parking details) and 73 (car parking details) of the above permission.
Meridian Water Willoughby Lane And Meridian Way London N18
PARTIAL DISCHARGE PLOT E1.1: Details pursuant to Ref: 16/01197/RE3 for verification report (11) verification report underlaps areas (40) drainage and suds implementation (44) in respect of the development of Phase 1 of Meridian Water comprising up to 725 residential units, new station building, platforms and associated interchange and drop-off facilities including a pedestrian link across the railway, a maximum of 950 sqm retail (A1/A2/A3), floorspace, a maximum of 600 sqm of community (D1) floorspace, a maximum of 750 sqm of leisure (D2) floorspace, associated site infrastructure works including ground and remediation works, roads, cycle-ways and footpaths, utility works above and below ground, surface water drainage works, energy centre and associated plant, public open space and childrens play areas, and various temporary meantime uses without structures (landscaping and open space). OUTLINE APPLICATION - ACCESS ONLY. An Environmental Statement, including a non-technical summary, also accompanies the planning application in accordance with the Town and Country Planning (Environmental Impact Assessment) Regulations 2011 (as amended by the 2015 Regulations).
Meridian Water Willoughby Lane And Meridian Way London N18
Details submitted pursuant to reference 16/01197/RE3: eradication strategy of invasive species (62) in respect of development of Phase 1 of Meridian Water comprising up to 725 residential units, new station building, platforms and associated interchange and drop-off facilities including a pedestrian link across the railway, a maximum of 950 sqm retail (A1/A2/A3), floorspace, a maximum of 600 sqm of community (D1) floorspace, a maximum of 750 sqm of leisure (D2) floorspace, associated site infrastructure works including ground and remediation works, roads, cycle-ways and footpaths, utility works above and below ground, surface water drainage works, energy centre and associated plant, public open space and childrens play areas, and various temporary meantime uses without structures (landscaping and open space). OUTLINE APPLICATION - ACCESS ONLY. An Environmental Statement, including a non-technical summary, also accompanies the planning application in accordance with the Town and Country Planning (Environmental Impact Assessment) Regulations 2011 (as amended by the 2015 Regulations).
Alma Estate EN3
Details pursuant to ref: 19/03834/RM: SUDs Strategy (2) for Details pursuant to condition 5 of outline planning permission ref: 15/2039/OUT and as amended by 17/04670/VAR, and proposed variation by 19/03624/VAR in respect of layout, scale, appearance, access, landscaping in relation to Phases 2A and 4 of Alma Estate for the construction of 3 apartment buildings and 13 houses varying between 3 and 7 storeys in height, comprising 303 residential units in total, Class A1 retail units uses and provision of public open space, private and semi-private amenity space, refuse/recycling and bicycle storage, on and off street car parking together with conditions for tree protection (9), ecology and biodiversity strategy (31), drainage strategy (35), green roofs (36), living walls (37), energy strategy (38), green procurement plan (43), SWMP (44), parking (52), loading/unloading (54), delivery and servicing (57), car park management (58), traffic calming (59), cycle parking (60).
223 Hertford Road London N9 7ER
Details pursuant to Ref: 23/00796/FUL for sustainable design and construction statement (10) in respect of the single storey rear extension (Class E) and alterations to shop front, with rear access and installation of security gate from Henderson Road.
262 Church Street London N9 9HQ
Details pursuant to ref: 22/00543/FUL (allowed on appeal APP/Q5300/W/22/3301033 for equipment to control emission (3) in respect of the change of use of part of ground floor from Cafe (Use class E(b) to Hot food takeaway (Sui Generis) involving installation of extractor flue and alterations to shop front including and retractable awning (PART RETROSPECTIVE).
53 Station Road London N21 3ND
Details pursuant to ref: 21/03121/FUL for energy statement (5) in respect of the change of use of existing building from Financial and Professional Services (Class E) to four residential units (Use Class C3) and a retail unit (Use Class E) involving single storey rear extension with rooms within pitched roof together with lightwell.
Meridian Water Willoughby Lane And Meridian Way London N18
PARTIAL DISCHARGE Details pursuant to ref: 16/01197/RE3: Implementation Plan and Verification Methods - Main Remediation Site (30) Phase 1A only, for the development of Phase 1 of Meridian Water comprising up to 725 residential units, new station building, platforms and associated interchange and drop-off facilities including a pedestrian link across the railway, a maximum of 950 sqm retail (A1/A2/A3), floorspace, a maximum of 600 sqm of community (D1) floorspace, a maximum of 750 sqm of leisure (D2) floorspace, associated site infrastructure works including ground and remediation works, roads, cycle-ways and footpaths, utility works above and below ground, surface water drainage works, energy centre and associated plant, public open space and childrens play areas, and various temporary meantime uses without structures (landscaping and open space). OUTLINE APPLICATION - ACCESS ONLY. An Environmental Statement, including a non-technical summary, also accompanies the planning application in accordance with the Town and Country Planning (Environmental Impact Assessment) Regulations 2011 (as amended by the 2015 Regulations).
Commercial Premises 40 Church Street Enfield EN2 6AZ
Details pursuant to ref: 20/02285/FUL: Energy Statement (3), shopfront (4), refuse storage facilities (6), cycle parking (7), for the conversion of first floor and second floor from ancillary office and storage to 6 self-contained flats involving alteration to shop front to create front entrance, external staircase at rear and first floor terrace.
Meridian Water Willoughby Lane And Meridian Way London N18
Details submitted pursuant to reference 20/03821/RM: proposed gate to the undercroft car parking (9) in respect of details of Reserved Matters (scale, layout, external appearance and landscaping) for 300 units in respect Plots E and A (Phase 1a) arranged across buildings from 3 to 12 storeys in height pursuant to condition 5 of planning permission 16/01197/RE3 dated 10 July 2017 for development of Phase 1 of Meridian Water comprising up to 725 residential units, new station building, platforms and associated interchange and drop-off facilities including a pedestrian link across the railway, a maximum of 950 sqm retail (A1/A2/A3), floorspace, a maximum of 600 sqm of community (D1) floorspace, a maximum of 750 sqm of leisure (D2) floorspace, associated site infrastructure works including ground and remediation works, roads, cycle-ways and footpaths, utility works above and below ground, surface water drainage works, energy centre and associated plant, public open space and childrens play areas, and various temporary meantime uses without structures (landscaping and open space). Application includes details pursuant to condition 29 (green procurement plan), condition 63 (biodiverse roof details), condition 65 (Energy statement), condition 86 (wind assessment), condition 71 (cycle parking details) and 73 (car parking details) of the above permission.