Land At Grid Reference 403536 198745 Ashton Road Siddington Gloucestershire
Compliance with condition 3 (Archaeology) of permission 20/04499/FUL - Construction of a temporary 19.94MW Solar Farm, to include the installation of Solar Panels with transformers, a DNO substation, customer substation, security fence, landscaping and other associated infrastructure (including a temporary construction access point)
Land East Of Periwinkle Hall Links Road Perry Green Bradwell Essex
Application for approval of details as reserved by condition 6 (Landscaping details) of approved application 21/01878/FUL- (Construction and operation of a solar photovoltaic farm)
Land Adjacent To Whinfield House Lime Lane Brafferton Darlington
Approval of details reserved by condition 5 (Construction Traffic Management Plan), 6 (Colour and finishes of buildings, fixed plant and machinery), 7 (Track Surfacing), 8 (Nesting Bird Scheme), 9 (Landscaping Scheme), 10 (Written Scheme of Investigation), 11 (Completion of Post Investigation Assessment) & 14 (Surface Water Drainage Scheme) attached to planning permission 21/00958/FUL dated 04 Oct 2022 (Proposed Installation of solar photovoltaic array/solar farm together with associated infrastructure (cross boundary application with Durham County Council)) (additional drainage statement received 13th June 2023 and 11th August 2023, amended landscape proposals, details of road construction and covering letter received 11th August 2023, addendum to BNG metric received 17th August 2023, addendum to landscape biodiversity management plan received 25th August 2023, construction traffic managment plan received 27th September 2023, revised landscape mitigation proposals received 5th October 2023, revised biodiversity metric received 11th October 2023, and amended construction traffic managament plan and details of site accesses to Lime Lane received 2nd November 2023)
Legoland Windsor Resort Winkfield Road Windsor SL4 4AY
Details required by Condition 7, part discharge (Materials) and Condition 8, part discharge (Construction Environmental Management Plan) of planning permission 17/01878/OUT for a Hybrid planning application seeking permission for the following Full (detailed) projects: Project 1 - the erection of 65 permanent semi-detached lodges (130 units) and 20 'barrels' with associated amenity facilities block to provide visitor accommodation, a central facilities 'hub' building, SUDS ponds, landscaping works (including equipped play areas) and associated infrastructure works ('Phase 1' of the holiday village); Project 2 - Reconfiguration of car parking and internal accesses and associated engineering/infrastructure works; Project 3 - Change of use of existing farm buildings from agricultural/'sui generis' use to Use Class D2, ancillary 'back of house'; accommodation and land for re-use by the theme park and the creation of one new access point from the existing car park and Project 4 - Extension and alterations to 'The Beginning' comprising new admissions building, extension to existing toilet facilities and new entrance portal. Permission for the following Outline projects: Project 5 - Construction of the '2019 attraction' comprising three 'attraction zones' for up to three new rides (one to be an indoor attraction and the other two to be uncovered or covered) with associated queue line areas, landscaping works and associated infrastructure; Project 6 - Construction of a new indoor ride on the 'Haunted House' site with associated queue line area, landscaping works and associated infrastructure; Project 7 - Extension to the existing 'Big Shop' LEGO store in 'The Beginning' area; Project 8 - Erection of up to 300 units of visitor accommodation ('Phases 2 and 3' of the holiday village) with two associated central facilities 'hub' buildings, SUDS ponds, landscaping, infrastructure works and car parking area.
Land To The West Of Butterfield Green Road Luton LU2 8DD
Change of use from agricultural land to a cemetery with construction of associated access, landscaping and ancillary works. Discharge of conditions 7 (Ecological strategy), 8 (additional ecological surveys), 9 (boundary treatment), 10 (Unexploded site safety & emergency procedures (UXO)), 13 (surface water drainage plan), 14 (drainage risk assessment), 16 (borehole management), 17 (archaeological investigation), 23 (burial management & location strategy), 26 (site access), 27 (enhancements to Butterfield Green Road), and 30 (parking monitoring) of planning permission 21/01176/FUL dated 4th March 2022.
Church Farm South Cowton Northallerton North Yorkshire DL7 0JB
Discharge of Condition 3 (Biodiversity Net Gain) and Condition 4 (Surface Water Drainage Plan) from previously approved application ZB23/01599/FUL- Construction of an agricultural building over an existing manure storage area as part of a catchment sensitive farming initiative
Blackhills Farm Crosby Northallerton North Yorkshire DL6 3RS
Discharge of condition 2 (materials) from previously approved application 23/00621/MRC (Change of use of agricultural land to allow construction of one holiday unit as replacement of an existing agricultural building)
Land Adjoining Forge Cottage Bakers Lane Dorridge Solihull
Discharge of condition 5- Construction Method Statement via CRT ; of approved Planning Application PL/2022/00762/PPFL - New gated access involving part removal of existing hedgerow, erection of an agricultural building and associated permeable hardstanding at land adjacent to Forge Cottage, Bakers Lane, Knowle, B93 0DZ.
Fernhill Barns Fernhill Lane Balsall Common Solihull CV7 7AN
Discharge of condition 6- Drainage of plannning Application - PL/2021/02180/PPFL -Demolition of 2 No. agricultural barns with construction of 2 No. dwellings and the retention/completion of a building referred to as Barn 2 to form 1 No. dwelling and associated works - approved 17-12-21 Drainage Assessment report and design.
Land At Grid Reference 403536 198745 Ashton Road Siddington Gloucestershire
Compliance with condition 13 (Construction Management Plan) of permission 20/04499/FUL - Construction of a temporary 19.94MW Solar Farm, to include the installation of Solar Panels with transformers, a DNO substation, customer substation, security fence, landscaping and other associated infrastructure (including a temporary construction access point)