Old Hall Farm Burneston Bedale North Yorkshire DL8 2HX
Discharge of conditions 2 (Materials) 3 (Hard Surface) 4 (Landscaping) 5 (Conversion works) 7 (Bat Survey) 8 (Surface Water) 9 (Phase 2 LCRM) 13 (Surface Water) 14 (Parking and turning) 15 (Parking for contractors) and 16 (Wheel Washing) from previously approved application 22/02607/FUL (Revised application for part demolition, conversion, replacement and extension of former agricultural building to form one dwelling and associated works) as amended by email received by North Yorkshire Council on 10 November 2023
Legoland Windsor Resort Winkfield Road Windsor SL4 4AY
Details required by Condition 7, part discharge (Materials) and Condition 8, part discharge (Construction Environmental Management Plan) of planning permission 17/01878/OUT for a Hybrid planning application seeking permission for the following Full (detailed) projects: Project 1 - the erection of 65 permanent semi-detached lodges (130 units) and 20 'barrels' with associated amenity facilities block to provide visitor accommodation, a central facilities 'hub' building, SUDS ponds, landscaping works (including equipped play areas) and associated infrastructure works ('Phase 1' of the holiday village); Project 2 - Reconfiguration of car parking and internal accesses and associated engineering/infrastructure works; Project 3 - Change of use of existing farm buildings from agricultural/'sui generis' use to Use Class D2, ancillary 'back of house'; accommodation and land for re-use by the theme park and the creation of one new access point from the existing car park and Project 4 - Extension and alterations to 'The Beginning' comprising new admissions building, extension to existing toilet facilities and new entrance portal. Permission for the following Outline projects: Project 5 - Construction of the '2019 attraction' comprising three 'attraction zones' for up to three new rides (one to be an indoor attraction and the other two to be uncovered or covered) with associated queue line areas, landscaping works and associated infrastructure; Project 6 - Construction of a new indoor ride on the 'Haunted House' site with associated queue line area, landscaping works and associated infrastructure; Project 7 - Extension to the existing 'Big Shop' LEGO store in 'The Beginning' area; Project 8 - Erection of up to 300 units of visitor accommodation ('Phases 2 and 3' of the holiday village) with two associated central facilities 'hub' buildings, SUDS ponds, landscaping, infrastructure works and car parking area.
Boldridge Farm Crudwell Lane Long Newnton Tetbury Gloucestershire GL8 8RT
Compliance with condition 13 (Drainage) of permission 21/03629/FUL - Demolition of farmhouse (western dwelling); the demolition of the modern elements and the erection of an extension to the older part of the existing cottage (eastern dwelling): conversion of Cart Barn to be used for home offices and other ancillary rooms; renovation of Stables and erection of replacement dwelling; demolition and relocation of Agricultural building; the installation of a ground sited solar array; and associated works including drainage engineering
West Newbiggin Farm Norton Back Lane Sadberge Darlington DL2 1SU
Approval of details reserved by Condition 5 (drainage) attached to planning permission 22/00135/FUL dated 8 December 2022 (Conversion, alteration and extensions of existing agricultural buildings to form 9 no. dwellings (2 no. 3 bed, 5 no. 4 bed, 2 no. 5 bed) including demolition of former piggeries and outbuildings, erection of 3 no. detached garage blocks, formation of hardstanding, landscaping and other associated works (Revised Scheme)) (Amended / additional information received 5th July 2023 and 18th August 2023)
Tunstall Cottage Tunstall Lane Nunthorpe Middlesbrough North Yorkshire TS7 0NU
Application for the discharge of condition 4 (Site and Survey Plans with levels) for previously approved application 19/02548/FUL. - Single-storey domestic extension with basement swimming pool. Refurbishment of existing building, including revised fenestration, removal of tennis court to create walled garden with glasshouse. Removal of two existing agricultural buildings and the erection of a new barn on existing menage 1348_EX20_02B Survey Site Plan 1348_AR20_04_C Proposals Site Plan
Tunstall Cottage Tunstall Lane Nunthorpe Middlesbrough North Yorkshire TS7 0NU
Application for the discharge of condition 5 (Site and Survey Plans with levels) for previously approved application 21/01580/FUL - Revised application for construction of a single-storey domestic extension with outdoor swimming pool. Refurbishment of existing building, including revised fenestration, removal of tennis court to create walled garden with glasshouse. Removal of two existing agricultural buildings and the erection of a new barn on existing menage. 1348_EX20_02B Survey Site Plan 1348_AR20_04_E Proposals Site Plan
The Hall Norton Road Stapleford Lincoln Lincolnshire LN6 9JY
Application to discharge conditions 3 (windows and doors), 11 (contamination), 14 (tree planting), 16 (specification for historic building recording) and 18 (bird scheme) attached to planning permission 22/0983/FUL and conditions 3 (windows and doors) and 4 (specification for historic building recording) attached to planning permission 22/0984/LBC - Change of use and conversion of disused barns to create farm shop, 6 no. holidays lets, conversion and extension of agricultural storage buildings to provide stabling ancillary to livery enterprise, installation of horse walker, formation of menage, associated car parking areas and improvements to access
Boldridge Farm Crudwell Lane Long Newnton Tetbury Gloucestershire GL8 8RT
Compliance with condition 8 (Ecological Design Strategy) of permissions 21/03629/FUL - Demolition of farmhouse (western dwelling); the demolition of the modern elements and the erection of an extension to the older part of the existing cottage (eastern dwelling): conversion of Cart Barn to be used for home offices and other ancillary rooms; renovation of Stables and erection of replacement dwelling; demolition and relocation of Agricultural building; the installation of a ground sited solar array; and associated works including drainage engineering
Barn At Manor House Main Street Ridlington Rutland
Discharge of condition 3 (wall & roofing materials/ finished colour) in relation to 2022/0924/FUL - Extension to existing agricultural unit, including demolition of part of existing structure and new solar panels to roof.
Legoland Windsor Resort Winkfield Road Windsor SL4 4AY
Details required by Condition 6 (plans/sections) (partial discharge), Condition 7 (Materials) (partial discharge), Condition 16 (Security/Access) (partial discharge) Condition 21 (surface water drainage scheme) of Planning Permission 17/01878 for Hybrid planning application seeking permission for the following Full (detailed) projects: Project 1 - the erection of 65 permanent semi-detached lodges (130 units) and 20 'barrels' with associated amenity facilities block to provide visitor accommodation, a central facilities 'hub' building, SUDS ponds, landscaping works (including equipped play areas) and associated infrastructure works ('Phase 1' of the holiday village); Project 2 - Reconfiguration of car parking and internal accesses and associated engineering/infrastructure works; Project 3 - Change of use of existing farm buildings from agricultural/'sui generis' use to Use Class D2, ancillary 'back of house'; accommodation and land for re-use by the theme park and the creation of one new access point from the existing car park and Project 4 - Extension and alterations to 'The Beginning' comprising new admissions building, extension to existing toilet facilities and new entrance portal. Permission for the following Outline projects: Project 5 - Construction of the '2019 attraction' comprising three 'attraction zones' for up to three new rides (one to be an indoor attraction and the other two to be uncovered or covered) with associated queue line areas, landscaping works and associated infrastructure; Project 6 - Construction of a new indoor ride on the 'Haunted House' site with associated queue line area, landscaping works and associated infrastructure; Project 7 - Extension to the existing 'Big Shop' LEGO store in 'The Beginning' area; Project 8 - Erection of up to 300 units of visitor accommodation ('Phases 2 and 3' of the holiday village) with two associated central facilities 'hub' buildings, SUDS ponds, landscaping, infrastructure works and car parking area.