The Straight Southall UB1 1QX
Details of a remediation validation/verification report in part pursuant to condition 38 (Phase 3 only) of planning permission ref: 171562VAR dated 16.10.2017 for "Section 73 application for minor amendment to vary condition 3 (approved drawings) to amend the outline scheme drawings and removal of condition 41 (details of soakaways) of outline planning permission reference PP/2015/4682 dated 18.02.16 for demolition of 22 houses; the remediation of the land and the redevelopment of the site to deliver a large mixed use development including residential, non-food retail, food retail, restaurants, bars and cafes, hotel, conference and banqueting, cinema, health care facilities, education facilities, office/studio units, car park, sports pavilion, an energy centre, multi-storey car park and associated car and cycle parking, landscaping, public realm, open space and children's play space. Full application: new access roads from the Hayes-By-Pass and Southall town centre to the application site for vehicle, cycle and pedestrian access, including drainage and a flood relief pond. Widening of South Road across the railway line, for the creation of a bus lane and three new accesses onto Beaconsfield Road. Two bridges over the Grand Union Canal and Yeading Brook to provide pedestrian and cycle access to Minet Country Park and Springfield Road. The quantum of development remains the same as the original scheme with the exception that the proposed development includes revised positioning of the hotel, supermarket and banqueting hall; the removal of the multi-storey car park to be replaced by basement car parking spaces; the removal of the east/west bus and taxi route through the Civic Square to be replaced by a dedicated pedestrian route and use for emergency vehicular access; proposed changes to the horizontal and vertical (height differences ranging between minus 4.5m and plus 17.5m) parameters and the locations of ground and upper floor uses; with an amendment to the
428 Long Drive Greenford UB6 8UH
Details of Materials and finishes to be used for all external surfaces of the development pursuant to condition 7 of planning permission ref: 202983FUL dated 09/10/2020 for: Part replacement and extension to warehouse by raising roof heights including provision of four floors of ancillary office space
The Straight Southall Middlesex UB1 1QX
Details of external noise in part pursuant to condition 79 (Phase 3 only) of planning application Ref: 171562VAR dated 16/10/2017 for 'Section 73 application for minor amendment to vary condition 3 (approved drawings) to amend the outline scheme drawings and removal of condition 41 (details of soakaways) of outline planning permission reference PP/2015/4682 dated 18.02.16 for demolition of 22 houses; the remediation of the land and the redevelopment of the site to deliver a large mixed use development including residential, non-food retail, food retail, restaurants, bars and cafes, hotel, conference and banqueting, cinema, health care facilities, education facilities, office/studio units, car park, sports pavilion, an energy centre, multi-storey car park and associated car and cycle parking, landscaping, public realm, open space and children's play space. Full application: new access roads from the Hayes-By-Pass and Southall town centre to the application site for vehicle..........'
Land To The West Of Western Road Park Royal NW10 7LT
Details of for surface water source control measure pursuant to condition 6 of planning permission ref: 190680OPDFUL dated 08/11/2019 for: Change of use of site from builders yard (Use Class Sui-Generis) to a car pound (Use Class B8); and ancillary development including construction of an office building; external alterations, car parking, boundary and internal security fencing and associated landscaping
Unit 3A East Horndon Business Park Tilbury Road West Horndon Brentwood Essex CM13 3LR
Discharge of conditions 6 (Surface water drainage scheme), 7 (Scheme to minimise risk of offsite flooding), 8 (Maintenance Plan) and 12 (Fencing for trees and hedges), of application 22/01751/FUL (Full planning application for the development of a Class B2 / B8 building (industrial and storage and distribution including ancillary office provision), with associated access, vehicle and cycle parking, servicing, landscaping, and infrastructure.)
Heatherwood Hospital London Road Ascot SL5 8AA
Details required by Condition 13 (public art strategy ) of Planning Permission 21/02792/REM for Reserved matters (appearance, landscaping, scale) pursuant to outline planning permission 16/03115/OUT Hybrid planning application comprising: 1) Application for full planning permission for the development of a new Elective Care Hospital and associated Admin Hub with associated parking, vehicle access, highway works, plant and landscaping 2) Application for full planning permission for the change of use of existing building to provide GP Practice, Office, Data Centre and Staff Restaurant in association with the Elective Care Hospital 3) Application for outline planning permission (access and layout determined with all other matters reserved for future consideration) for demolition of existing hospital and redevelopment of up to 250 dwellings with associated vehicle access and highway works 4) Application for full planning permission for the change of use of existing woodland to Suitable Alternative Natural Greenspace (SANG) in association with the outline residential planning permission.
The Straight Southall Middlesex UB1 1QX
Details of home zone within each residential part plan in part pursuant to condition 72 (Phase 3) of planning permission Ref:171562VAR dated 16.10.2017 "Section 73 application for minor amendment to vary condition 3 (approved drawings) to amend the outline scheme drawings and removal of condition 41 (details of soakaways) of outline planning permission reference PP/2015/4682 dated 18.02.16 for demolition of 22 houses; the remediation of the land and the redevelopment of the site to deliver a large mixed use development including residential, non-food retail, food retail, restaurants, bars and cafes, hotel, conference and banqueting, cinema, health care facilities, education facilities, office/studio units, car park, sports pavilion, an energy centre, multi-storey car park and associated car and cycle parking, landscaping, public realm, open space and children's play space.Full application: new access roads from the Hayes-By-Pass and Southall town centre to the application site for vehicle, cycle and pedestrian access, including drainage and a flood relief pond. Widening of South Road across the railway line, for the creation of a bus lane and three new accesses onto Beaconsfield Road. Two bridges over the Grand Union Canal and Yeading Brook to provide pedestrian and cycle access to Minet Country Park and Springfield Road. The quantum of development remains the same as the original scheme with the exception that the proposed development includes revised positioning of the hotel, supermarket and banqueting hall; the removal of the multi-storey car park to be replaced by basement car parking spaces; the removal of the east/west bus and taxi route through the Civic Square to be replaced by a dedicated pedestrian route and use for emergency vehicular access; proposed changes to the horizontal and vertical (height differences ranging between minus 4.5m and plus 17.5m) parameters and the locations of ground and upper floor uses; with an amendment to the spatial
56 - 58 Factory Lane Croydon CR0 3RL
Discharge of condition 4 (landscaping and boundary treatment) attached to planning permission for 21/06012/FUL for demolition of existing buildings and the development of a Class E(g)ii, E(g)iii, B2 and B8 use employment unit with ancillary office accommodation, associated external yard areas, HGV, car parking and cycle parking, servicing areas, external lighting, soft landscaping, infrastructure and associated works.
DB Symmetry Phase 2 Land East Of Lingfield Estate Lingfield Point DARLINGTON
Approval of details reserved by conditions relating to plot 2, (4) materials, (5) foul water, (8) SUDS, (15) phase 2 SI & RA, (16) phase 3 RVS, (19) CMP and (25) trees and conditions relating to plot 2 & 3, (29) highways, (30) swept path and (31) RSA attached to outline application 19/00036/OUT dated 20 March 2020 (erection of up to 58,529 sqm (630,000 sq. ft.) of B1 and/or B2 and/or B8 uses comprising an office/industrial development; ancillary development including restaurants/cafe (A3/A5), Public House (A4), Hotel (C1), and Petrol Filling Station (Sui Generis); together with other associated works with all matters reserved) (amended drainage impact assessment and drainage maintenance management plan received 25th August 2023)
The Hub Paradise Hemel Hempstead Hertfordshire
Details as required by condition 8a (Remediation) attached to planning permission 21/04352/MFA (Demolition of existing light industrial building. Construction of mixed use development comprising 2 storey commercial building, with foodbank, bike workshop, office space and cafe area. Seven storey residential building (6 storey from main entrance plus lower ground floor to access ancillary spaces and parking) comprising 56 residential units, mix of 1 and 2 bedrooms, bin store, cycle store and parking. Associated parking spaces, scooter store and landscape.)